Little Leys Charlbury

This project consisted of 11 high end houses finished to the highest standard. Each property had underfloor heating to the ground floor with radiators providing heating to the first floor. The hot water system was provided via a pressurised cylinder located in a cylinder cupboard; hot water return pumps were installed to provide instant hot water at each tap. The sanitaryware on this project was Saneux with Crosswater brassware. There were also 11 HA/Social houses overseen by SOHA housing association.

Key Facts
Client:
Ede Homes
Main Contractor:
Builders Ede
Value:
£330,000.00
Start Date:
December 2017
End Date:
December 2018